Option B Design Considerations
Why does the road between TH roundabout and the new roundabout west of TH roundabout, needs to be upgraded to dual-carriageway?
Option B, what is the additional cost?
Why is the legislation around the AONB (NNNPF) not given more prominence in the engagement brochure?
Why is Option B incorporated with Option 1 only £20m more when other options are £50m more?
Will option B need to be as wide a road as option A?
In option B, what if anything happens to the section of the A435 between 7 bends and the TH roundabout. Will a weight limit/speed restriction be put in force?
If Option A, how will the impact on residents of road closures and limited access during construction be managed/mitigated, given the limited alternative routes?
Main
Route Options
Option B Design Considerations
Category - Option B Design Considerations
Articles
Why does the road between TH roundabout and the new roundabout west of TH roundabout, needs to be upgraded to dual-carriageway?
Option B, what is the additional cost?
Why is the legislation around the AONB (NNNPF) not given more prominence in the engagement brochure?
Why is Option B incorporated with Option 1 only £20m more when other options are £50m more?
Will option B need to be as wide a road as option A?
In option B, what if anything happens to the section of the A435 between 7 bends and the TH roundabout. Will a weight limit/speed restriction be put in force?
If Option A, how will the impact on residents of road closures and limited access during construction be managed/mitigated, given the limited alternative routes?