Considering that Option A would impact a greater number of residents due to its proximity and associated pollution, how can it be justified as a viable choice during a declared climate emergency by both GCC and TBC, especially given the urgent need to address the climate crisis?
Option A would result in the volume of traffic using the A435 south of Teddington Hands roundabout increasing by over 15,000 vehicles per day; from 8.500 to c.24,000. On average (as we don’t have the peak time data, nor the split north/south), this equates to an extra 10 vehicles per minute in each direction (or 16 in total), resulting in a vehicle every 4 seconds on average, it would be even worse at peak times. Do you agree that even with the proposed upgrade to the junction, this would effectively prevent access to and from Teddington village, or at the least make it extremely dangerous?
How much more traffic will be on the small dualled part of A46 (if B is used) than on the A435 between Seven bends roundabout and Teddington Hands roundabout if A is used?
With all routes having a Benefit-Cost Ratio (BCR) of 2 or less, how does the council justify the significant expenditure on any of these proposals?