What mitigation measures, all forms of pollution, diversions etc, will be implemented during the construction of both Options A and B?
If J9 is considered currently too dangerous and this is sited as 1 justification for the new road, why does Option A propose shifting that traffic to a road (A435) measured as 10 times as dangerous? (Table 3-3 and 3-4 in Scheme context and existing conditions)?
Why are traffic flows in the western section of the scheme lower than on the eastern section? Where is that additional traffic going?
What mitigation measures, all forms of pollution, diversions etc, will be implemented during the construction of both Options A and B?
Why are traffic flows in the western section of the scheme lower than on the eastern section? Where is that additional traffic going?
The figure only provides total vehicle figures, there is no breakdown of type of vehicle. Specifically, there are no HGV flows; can these been provided?
Using Option 1, how much less (%) will projected traffic on the road decrease by? And is this traffic that will no longer come from M50/Tewkesbury town.
How much more traffic will be on the small dualled part of A46 (if B is used) than on the A435 between Seven bends roundabout and Teddington Hands roundabout if A is used?