< All Topics
Print

If Option A, will the A435 have to be elevated and if so, by how much?

During the next stage of scheme development, drainage and flood risk assessments will be carried out, together with further highway design. This will determine if changes are needed to the existing A435 carriageway level to accommodate Option A. 

Teddington & Alstone A46 Advisory Group