< All Topics
Print

If J9 is considered currently too dangerous and this is sited as 1 justification for the new road, why does Option A propose shifting that traffic to a road (A435) measured as 10 times as dangerous? (Table 3-3 and 3-4 in Scheme context and existing conditions)?

Not answered

Teddington & Alstone A46 Advisory Group